The double chairlift (mountain lift) is in operation in summer and winter.
In winter there are also 2 button lifts and 4 drag lifts in operation.
Summer operation 2024: From mid May to mid October every Saturday / Sunday / public holiday from 9 a.m. to 5 p.m.
Further information: www.aflenzer-buergeralm.at